Log in
We assess the potential environmental impacts of our projects before starting construction. The assessment is documented in a Review of Environmental Factors (REF). Where we're seeking comments from our stakeholders and community, REFs are exhibited on Sydney Water Talk. The REFs published below are for projects that cost more than $5 million or require specified environmental or heritage permits.
Publication | What the publication's about |
---|---|
REF assesses potential environmental impacts of Mt Pleasant Reservoir Roof Repair and Relining. |
|
REF assesses potential environmental impacts of the CWM Renewal T41-S01 Pine Avenue, Five Dock. |
|
REF assesses potential environmental impacts of the NSOOS Interim Desilting Section 1 Assessment. |
|
REF assesses potential environmental impacts of the Badgerys Creek Wastewater Phase 2. |
|
Prospect Pre-treatment Plant Augmentation and Upgrade program |
REF assesses potential environmental impacts of the Prospect Pre-treatment Plant Augmentation and Upgrade program (Package 1). |
Thompson's Creek and South Creek Catchments Wastewater Network Stage 1 Thompson's Creek and South Creek Catchments Wastewater Network (Addendum) |
REF assesses potential environmental impacts of the Thompsons Creek and South Creek Catchments Wastewater Network project Stage 1. |
Temporary overflow relief structure at Clontarf Syphon House, Clontarf |
REF assesses potential environmental impacts of the proposal to construct and operate a temporary overflow relief structure at the Clontarf Syphon House as part of the broader Northern Sydney Ocean Outfall Sewer (NSOOS) desilting and rehabilitation program |
REF assesses potential environmental impacts of the Avon High Voltage Renewal. |
|
REF assesses potential environmental impacts of Calderwood Package 3A2 Wastewater Servicing. |
|
REF Multiprogram – Category B (Category B REF) is to be read in conjunction with the Review of Environmental Factors Multi-program pipeline and related infrastructure replacement, repair and upgrades (Multi-program REF) (May 2023) |
|
REF assesses the potential environmental impacts of Dunmore pumping station redesign. |
|
REF Multiprogram – Category B (Category B REF) is to be read in conjunction with the Review of Environmental Factors Multi-program pipeline and related infrastructure replacement, repair and upgrades (Multi-program REF) (May 2023). Together, both documents assess the potential environmental impacts of Critical Water Main. |
|
REF assesses the potential environmental impacts associated with the rehabilitation of Tunnels 1, 3 and 5 of the Burraneer Wastewater Carrier. |
|
REF assesses potential environmental impacts of roof repair and relining at Mt Nebo Upper Reservoir (WS0078). |
|
Installation of an Odour Control Unit (OCU) for pumping stations SP0895 and SP0896 in Penrith |
REF assesses potential environmental impacts of the installation of an Odour Control Unit (OCU) for pumping stations SP0895 and SP0896 in Penrith. |
REF assesses potential environmental impacts of the wastewater main renewal at Slade Park, Austinmer. |
|
REF assesses potential environmental impacts of Marayong Reservoirs Refurbishment. |
|
Northside Storage Tunnel Wet Well Desilting and Decline Tunnel Rehabilitation |
REF assesses potential environmental impacts of Northside Storage Tunnel (NST) Wet Well Desilting and Decline Tunnel Rehabilitation. |
REF assesses potential environmental impacts of increasing duration of silt bin storage. |
|
New underground NSOOS access cavern at North Head Water Resource Recovery Facility New underground NSOOS access cavern at North Head Water Resource Recovery Facility (Addendum) |
REF assesses potential environmental impacts of a new underground NSOOS access cavern at North Head Water Resource Recovery Facility. |
REF assesses potential environmental impacts of the upgrades to Corrimal Reservoir WS0213. The upgrades include a roof renewal, upgrade of the on-site staircase, installation of a retaining wall and a new chemical dosing kiosk. |
|
Upper Cascades Reliability Improvement Program – Catalina Reservoir |
REF assesses potential environmental impacts of the Upper Cascades Reliability Improvement Project, in particular the construction of a new reservoir (Catalina Reservoir) off Valley Road, Katoomba. |
Wet Weather Overflow Abatement Program Y24-25 Source Control Stage 1 |
REF Multiprogram – Category B (Category B REF) is to be read in conjunction with the Review of Environmental Factors Multi-program pipeline and related infrastructure replacement, repair and upgrades (Multi-program REF) (May 2023). Together, both documents assess the potential environmental impacts of WWOAP Y24-25 Source Control Stage 1. |
West Pennant Hills Water Pumping Station – WP0129 High Voltage (HV) Renewal |
REF assesses potential environmental impacts of West Pennant Hills Water Pumping Station – WP0129 High Voltage (HV) Renewal. |
REF assesses potential environmental impacts of Tank Stream Reinstatement. |
|
Malabar System Investment Program Near Term Works – Package 3 and 4B |
REF assesses potential environmental impacts of Malabar System Investment Program (MSIP) Near Term Works – Package 3 and 4B (the proposal). |
Construction and operation of a depot at Boiler Paddock South, Peter Brock Drive, Prospect |
REF assesses potential environmental impacts of the proposal to construct and operate a regional depot to be used by Sydney Water contractors in the West Region as part of the Partnering for Success program. |
REF assesses potential environmental impacts of the Sydenham to Bankstown Wastewater Upsizing – Marrickville and Belmore proposal. |
|
REF assesses potential environmental impacts of Badgerys Creek wastewater network stage 1a, package 1. |
|
REF assesses potential environmental impacts of SP0213 Carramar OCU. |
|
REF assesses potential environmental impacts of SP0895 Mechanical and Electrical Upgrade. |
|
REF assesses potential environmental impacts of the Menangle Park Wastewater Infrastructure proposal. |
|
REF assesses potential environmental impacts of changes to 3 upgrade projects at Wollongong Water Resource Recovery Facility. |
|
REF assesses potential environmental impacts of the proposal to construct a sewer lead-in carrier to service 305 South Street, Marsden Park. |
|
REF assesses potential environmental impacts of the proposal to upgrade the thickened sludge pumps at Riverstone Wastewater Resource Recovery Facility. |
|
Servicing Growth in West Dapto Package 3 – Cleveland Precinct Servicing Growth in West Dapto Package 3 – Cleveland Precinct (Addendum) |
REF assesses potential environmental impacts of Servicing Growth in West Dapto Package 3 – Cleveland Precinct. |
REF assesses potential environmental impacts of the Upper Parramatta Source Control – Stage 1 Group C project. |
|
Western Sydney Aerotropolis Growth Area – Drinking Water – Package 1c |
REF assesses potential environmental impacts of the Western Sydney Aerotropolis Growth Area. |
REF assesses potential environmental impacts of the Epping to St Leonards – New Marsfield Reservoir. |
|
REF assesses potential environmental impacts of the Calderwood Package 3A1 Mount Terry Lead-in Mains. |
|
Western Sydney Aerotropolis Growth Area – Drinking Water – Stage 1 Package 2 |
REF assesses potential environmental impacts of the Western Sydney Aerotropolis Growth Area. |
REF assesses potential environmental impacts of the Mort Street sewerage system upgrade project in Balmain. |
|
REF assesses potential environmental impacts of the Penrith CBD drinking water and wastewater. |
|
REF assesses potential environmental impacts of the maintenance hole and emergency relief structure repair outside Lane Cove National Park. |
|
REF assesses potential environmental impacts of the maintenance hole and emergency relief structure repair outside Lane Cove National Park. |
|
REF assesses potential environmental impact of North West Growth Area Package. |
|
REF assesses potential environmental impacts of Mid Parramatta Source Control Stage 2 Relining. |
|
REF assesses potential environmental impacts of Yallah Marshall Mount water and wastewater servicing critical water main renewals – Bunnergong Road
|
|
REF assesses potential environmental impacts of the Sewer Realignment on Fulton Avenue, Wentworthville. |
|
REF assesses potential environmental impacts of Frenchs Forest Reservoir Refurbishment. |
|
REF assesses potential environmental impacts of Cosgroves Creek Wastewater Network. |