The new wastewater pipeline will run mostly underground between Chelmsford Avenue, Naremburn and Anzac Park, Cammeray. Most of the pipeline will be built using microtunnelling, which allows new pipe to be installed underground without digging a continuous trench along the route. Temporary work sites will be needed to support tunnelling and connect the new infrastructure to the existing wastewater network. Some local connection works will be completed using smaller-scale tunnelling and open trenching. Based on current planning, proposed work sites are located at Anzac Park, West Street, Chandos Street, Waters Road, Naremburn Park, Francis Street and Chelmsford Avenue.