Once built, these large pipes will transfer drinking water from a nearby reservoir to the smaller pipes that supply homes and businesses.
We're planning and delivering new drinking water infrastructure to support growing communities in the South West Growth Area and parts of the Western Sydney Aerotropolis.
The NSW Government has identified the Austral–Leppington catchment as a key growth area. It sits along the eastern edge of the South West Growth Area and includes parts of the Western Sydney Aerotropolis. This catchment is expected to grow significantly – from 2,300 homes in 2022 to around 38,000 by 2056.
To support this growth, we're planning and delivering three drinking water projects as part of the South West Growth Area Drinking Water Program.
We're planning a new 2.3 kilometre drinking water pipeline along Edmondson Avenue and into Fifteenth Avenue in Austral.
We've completed detailed design, with construction planned to start in early 2027.
In Leppington, we've completed concept design and environmental assessments for about 4.8 kilometres of new drinking water pipelines connecting the area to Leppington Reservoir.
Subject to approvals and funding, construction is planned to start in late 2027 and finish in late 2028.
We're also progressing concept design for a proposed 3.1 kilometre drinking water pipeline from Cecil Park Reservoir to Austral through Western Sydney Parklands.
Construction timing remains subject to approvals and funding.
This new infrastructure will help provide reliable drinking water for growing communities and support new homes and economic growth across the area.
Sydney Water is planning a new drinking water pipe along parts of Edmondson Avenue, Craik Avenue, Ninth Avenue and Fifteenth Avenue in Austral. This new infrastructure will support population and economic growth in the area.
Planning for new drinking water pipes in parts of Leppington and Austral
Once built, these large pipes will transfer drinking water from a nearby reservoir to the smaller pipes that supply homes and businesses.
We are currently in the planning and design phase of the projects. We will know more about the pipeline locations as the planning and design phases progress.
We are using the limited capacity in the network to support development, however more pipes are needed for the large number of new homes expected in the South West Growth Area and nearby Aerotropolis. The new water infrastructure is planned to be operational from Q3 2027, pending approvals.
No, these are large pipes that take water from the reservoir to the suburb. Developers are responsible for installing the smaller pipes that service homes.
We are liaising with local councils, Transport for NSW, Sydney Trains, Western Sydney Parklands, energy and utility providers, major developers, private property owners and Water NSW to ensure that the project is coordinated with other activities and infrastructure projects in the area.
We will prepare a Review of Environmental Factors (REFs) for each project in the SWGA Drinking Water program, which will assess the potential environmental impacts within the program and identify mitigation measures to avoid or minimise environmental impacts.
For example, this can include avoiding open trenching in the environmentally sensitive or culturally significant areas by boring the pipeline underground or completing work at specific times to avoid sensitive times for local animals or the community.
To minimise the impact on native plants and animals, the REF will be undertaken by an approved ecologist with mitigation measures implemented, based on their assessment.
The REFs will be prepared in accordance with Part 5 of the Environmental Planning and Assessment Act 1979.
Protecting the environment is a core value at Syndey Water. All efforts will be made to minimise the removal of trees. In the instance where trees must be removed, we will develop a replanting program.
Additionally, all areas disturbed by our construction activity will be restored as close as possible to their prior condition at the end of construction.
We will restore all roads, footpaths, kerb, guttering and verges impacted by our construction activity. When repairing roads, work is generally done in 2 stages:
The permanent restoration of roads will be done in accordance with Transport for NSW and local council requirements.
We are in the planning and design phases of these projects. We will inform nearby homes and businesses about site investigations planned for the area.