Our water resource recovery facilities use multiple processes to treat wastewater for reuse or return to the environment. We ensure it meets strict water quality requirements to use as recycled water or releasing it to creeks, rivers and the ocean.

The treatment process and water quality required depends on:

  • whether it will be supplied and used as recycled water
  • where the treated wastewater will be discharged or reused.

We follow strict Environment Protection Licence (EPL) conditions issued by the NSW Environment Protection Authority (EPA).

The EPA monitors the effect of the treated wastewater that we discharge on water quality and aquatic life.

Find your local water resource recovery facility on our wastewater systems map.

Treatment processes

There are 4 main types of treatment processes, plus disinfection.

Primary treatment removes large solids and grit from wastewater.

Screens trap and remove things such as food scraps, wet wipes, cotton buds and plastic as wastewater flows through. 

Grit tanks cause small, heavy particles like sand (grit) to sink to the bottom of a tank and a scraper removes it.

Sedimentation tanks allow solids (sludge) to settle to the bottom, and oils and grease (scum) float to the top. Scrapers at the top and bottom of the tanks remove the sludge and scum, which are then treated to produce biosolids.

Primary treatment at Wollongong

We use microorganisms (activated sludge) to break down organic material and nutrients like nitrogen and phosphorous.

Learn more about Removing nutrients in wastewater.

Next, we separate the activated sludge from the treated wastewater, as smaller organic solids settle at the bottom of the tank.

Secondary treatment at Cronulla

Tertiary treatment removes nearly all biodegradable and suspended matter to further improve quality. This process removes finer particles and reduces nutrients to very low levels.

Tertiary treatment at Rouse Hill

Advanced tertiary treatment uses ultrafiltration or microfiltration membranes to remove finer particles and reduce nutrients even lower.

Reverse osmosis uses fine barrier membranes at high pressure to improve the water quality even further, including removing dissolved salts.

What's inside a microfiltration membrane

Disinfection is the last step for all levels of treatment, and uses chlorine and/or ultraviolet light to deactivate microorganisms. 


How we reuse wastewater and recover resources 

We use conventional and advanced technologies at our water resource recovery facilities to treat and reuse wastewater and recover resources.

Nearly all of our facilities either produce recycled water, reuse by‑products, or generate energy. Some do all three.

We're committed to reducing our environmental impact and helping to address climate change.

What we produce

Recycled water produced from wastewater is treated so it’s safe and appropriate for its intended use. The recycled water we produce at our water resource recovery facilities can be used: 

  • in homes and businesses
  • for irrigation 
  • in industry 
  • for firefighting and dust suppression
  • to supplement environmental flows and improve waterway health.  

We manage and monitor our recycled water to ensure it meets the Australian Guidelines for Water Recycling (ADWG) and NSW Health requirements. 

Our water resource recovery facilities reuse treated wastewater on their site to help save drinking water.

Biosolids are a nutrient-rich fertiliser created from the organic wastewater solids (or sludge), during the wastewater treatment process. They're a rich source of phosphorus and nitrogen and can be used in agriculture, forestry, composting and land rehabilitation.

Using biosolids in land applications is highly regulated, and we comply with all testing and reporting requirements set by the EPA.

Producing biosolids helps us reduce our environmental footprint by:

  • recycling a valuable resource that helps minimise disposal to landfill
  • reducing the amount of chemical fertilisers used on farms
  • producing carbon-neutral biogas to generate renewable energy, to help power our water resource recovery facilities.

We're NSW's largest producer of biosolids, generating nearly 200,000 wet tonnes of biosolids from wastewater each year – that's equivalent to about 9,000 semi-trailer loads.

We generate renewable energy at our water resource recovery facilities. We recover this energy in different forms, including electricity and gas.

Hydroelectricity

At our North Head Water Resource Recovery Facility, we generate hydroelectricity by capturing energy from treated wastewater as it flows to the deep ocean outfall.

Solar energy

As part of our commitment to achieving net-zero emissions, we have installed solar panels and solar hot water systems at several of our water resource recovery facilities. We will also continue to invest in solar systems across our facilities to generate and harvest solar energy.

Power generated from solar panels supplies electricity to operate parts of our facilities. 

Biomethane (renewable gas)

We've partnered with Jemena to install a biogas upgrader at our Malabar Water Resource Recovery Facility.

Excess biogas not used for co-generation is further treated to produce renewable gas (biomethane), that can be supplied to Jemena's customers via the local gas network.


What we do at each facility

Nearly all of our facilities recycle water, reuse by-products, or generate some of the energy they need to do their job. Details in the table below are current for 2024–2025.

ML = megalitres, or million litres

Less than 1% of Sydney's wastewater is discharged to the ocean untreated, at Vaucluse, Diamond Bay and Diamond Bay South. The Refresh Vaucluse Diamond Bay project will ensure that all wastewater is treated at Bondi Water Resource Recovery Facility in the future.

FacilityWastewater treatment levelRecovered resourcesAvg. dry weather discharge of treated wastewater to waterwayEPL waterways discharge volume limit1Treated wastewater – waterway discharge locationRecycled water – type of use, supply location, waterway discharge location

Bellambi2,3

Primary (stormwater management)

N/A

0 ML/day

Refer to Wollongong

Bellambi Point during wet weather.

N/A

Bombo

Secondary

Recycled water

Biosolids

4 ML/day

45 ML/day

Bombo Point as ocean outfall.

Supplied to and used at Kiama Golf Club.

Bondi

Primary

Biosolids

Renewable energy

113 ML/day

680 ML/day

As deepwater ocean outfall 2.2 km from the shoreline with 63 m maximum water depth and 512 m diffuser zone.

N/A

Brooklyn

Tertiary

N/A

0.3 ML/day

2.1 ML/day

Hawkesbury-Nepean River at 14 m depth – located on second pylon of the old road bridge, adjacent to Kangaroo Point.

N/A

Castle Hill

Tertiary

Recycled water

 

5.7 ML/day

80 ML/day

Cattai Creek.

Supplied to and used at Castle Hill Country Club.

Cronulla

Tertiary

Biosolids

Renewable energy

55.3 ML/day

432 ML/day

Potter Point, Kurnell, as ocean outfall.

N/A

Fairfield2,4

Primary
(stormwater treatment)

N/A

0 ML/day

Refer to Malabar

Occasional discharge to Georges River via Orphan School Creek during wet weather.

N/A

Gerringong-Gerroa

Tertiary

Recycled water

0 ML/day

0.8 ML/day (sand dunes)

Sand dune systems. When the discharge volume limit to sand dunes reaches capacity, discharges go to Crooked River.

Used for agricultural irrigation at Aorangi Farm.

Excess discharged to sand dunes. When the discharge volume limit to sand dunes reaches capacity, discharges go to Crooked River.

Glenfield4

Secondary

Biosolids

Renewable energy

0 ML/day

Refer to Malabar

Transported to Malabar. Occasional discharge to Georges River in wet weather.

N/A

Hornsby Heights

Tertiary

Biosolids

6 ML/day

85 ML/day

Berowra Creek via Calna Creek.

N/A

Liverpool4

Secondary

Recycled water

Biosolids

Renewable energy

0 ML/day

Refer to Malabar

Transported to Malabar. Also supplied to Fairfield (operated by Aquanet and Veolia Water) under Rosehill Recycled Water Scheme.

Occasional discharge to Georges River in wet weather.

Supplied to and used at Liverpool Golf Club and Warwick Farm Racecourse.

Malabar

Primary

Biosolids

Biogas

Renewable energy

493 ML/day

1,199 ML/day

As deepwater ocean outfall 3.6 km from shoreline – with 82 m maximum water depth and 720 m diffuser zone.

N/A

North Head

Primary

Biosolids

Renewable energy

345 ML/day

1,400 ML/day

As deepwater ocean outfall 3.8 km from shoreline – with 60 m approximate water depth and 763 m diffuser zone.

N/A

North Richmond

Secondary

N/A

1.2 ML/day

11.2 ML/day

Hawkesbury-Nepean River via Redbank Creek.

N/A

Penrith5

Tertiary

Recycled water

Biosolids

24.7 ML/day

238 ML/day

Excess designed to be discharged via Boundary Creek to Hawkesbury-Nepean River.

Most recycled water transferred to St Marys Advanced Water Treatment Plant.

Also supplied to and used at Penrith City Council parks and sports fields.

Picton

Tertiary

Recycled water

Biosolids

2.5 ML/day

15 ML/day

Precautionary treated wastewater and wet weather overflows discharged to Stonequarry Creek.

Supplied to and used at Picton Farm.

Port Kembla2,3

Primary (stormwater treatment)

N/A

0 ML/day

Refer to Wollongong

Red Point headland during wet weather.

N/A

Quakers Hill

Tertiary

Recycled water

41.3 ML/day

281.2 ML/day

Excess discharged via Breakfast Creek to Eastern Creek.

Supplied to and used at Stonecutters Ridge Golf Club.

Richmond

Tertiary

Recycled water

Biosolids

1.5 ML/day

20.1 ML/day

Excess discharged to Rickabys Creek.

Supplied to and used at University of Western Sydney (Hawkesbury Campus) and Richmond Golf Club.

Also used to irrigate our Eucalyptus plantation next to the facility (used by Taronga Zoo).

Riverstone

Tertiary

Biosolids

15.4 ML/day

104 ML/day

South Creek via Eastern Creek.

N/A

Rouse Hill

Tertiary

Recycled water

Biosolids

19.8 ML/day

151 ML/day

Excess discharged to Second Ponds Creek via wetlands to Cattai Creek.

Supplied to homes and businesses in the Rouse Hill area for non‑drinking use.

Shellharbour

Secondary

Biosolids

19.6 ML/day

170 ML/day

Discharged via an offshore outfall 130 m from Barrack Point with a diffuser zone.

N/A

St Marys5

Tertiary

Recycled water

Biosolids

Renewable energy

 

29.6 ML/day

250 ML/day

Excess discharged to South Creek via an unnamed creek.

 

Most recycled water transferred to St Marys Advanced Water Treatment Plant.

Also supplied to and used at Dunheved Golf Club.

St Marys Advanced Water Treatment Plant5

Advanced tertiary

Recycled water

50 ML/day

55 ML/day

Environmental flows discharged to Boundary Creek under the Western Sydney Replacement Flows Recycled Water Scheme.

Facility receives tertiary treated recycled water from St Marys and Penrith to produce highly treated advanced tertiary recycled water.

Wallacia

Tertiary

Biosolids

1 ML/day

15 ML/day

Discharged to Hawkesbury-Nepean River via Warragamba River.

N/A

Warriewood

Secondary

Biosolids

Renewable energy

17.4 ML/day

125 ML/day

Discharged at Turimetta Head via ocean outfall.

N/A

West Camden

Tertiary

Recycled water

Biosolids

21.8 ML/day

120 ML/day

Excess discharged to Hawkesbury-Nepean River via Matahill Creek.

Supplied to and used at Elizabeth Macarthur Agricultural Institute, Glendon Brae Pastoral Company and A Smart Farmer.

West Hornsby

Tertiary

Biosolids

12 ML/day

154.3 ML/day

Berowra Creek via Waitara Creek.

N/A

Wilton

Tertiary

Recycled water

Biosolids

0 ML/day

3 ML/day

Occasional discharge to Stringybark Creek.

Supplied to homes and businesses in Bingara Gorge estate for non‑drinking use.

Also supplied to and used at Bingara Gorge Golf Course, as well as parks and green space within the estate.

Excess occasionally discharged to Stringybark Creek.

Winmalee

Tertiary

Biosolids

18 ML/day

330 ML/day

Hawkesbury-Nepean River via an unnamed creek.

N/A

Wollongong

Tertiary and Advanced tertiary

Recycled water

Biosolids

Renewable energy

36.3 ML/day

320 ML/day

Excess discharged at Coniston Beach as offshore ocean outfall.

Tertiary treated recycled water supplied to and used at Port Kembla Coal Terminal, Wollongong Golf Club and Wollongong City Council sports fields.

Advanced tertiary treated recycled water supplied to and used at BlueScope Steel.

Table notes

 

  1. Discharge volume limit is specified in environment protection licence issued by NSW Environment Protection Authority (EPA).
  2. Bellambi, Port Kembla and Fairfield facilities only receive flow during storm events.
  3. Port Kembla and Bellambi facilities are part of the Wollongong system.
  4. Fairfield, Glenfield and Liverpool facilities are part of the Malabar system.
  5. St Marys Advanced Water Treatment Plant is not in use while restoration work is being completed at Boundary Creek. Treated wastewater discharged during dry weather from Penrith and St Marys facilities is being diverted to an unnamed creek that flows to South Creek.