Last updated: January 2009
Sewer mining is the process of tapping into a sewer, (either before or after the sewage treatment plant), and extracting sewage, which is then treated and used as recycled water.
Sewer mining generates residuals, some of which may be discharged into the sewerage system provided certain acceptance conditions can be met.
In relation to sewer mining, Sydney Water's objectives are:
This policy relates to applications to Sydney Water to connect to its sewerage system, extract sewage and discharge residuals back into its sewerage system, for the purpose of sewer mining.
Sydney Water will permit sewer mining provided:
Sydney Water will permit connection to the sewerage system for sewer mining as long as:
A number of state government and local government agencies are involved in assessing the feasibility of a sewer mining operation, connecting to Sydney Water's sewerage system, and operating a sewer mining facility.
Where Sydney Water is involved, its processes will be fair and transparent in providing:
Sewage contains various waste substances. While Sydney Water has wastewater source management systems in place, it cannot fully control the content of sewage extracted by a sewer miner. Incidents of illegal and unforseen discharges of substances into the sewer do occur.
The content of sewage in a sewerage system may change over time as the upstream sewage catchment changes with ongoing development. For example, commercial development may replace residential development and vice versa. Sewer miners will be required to acknowledge and be aware that existing and future trade waste discharges might alter the contents of sewage in the sewerage system.
As Sydney Water cannot fully control the content of sewage, Sydney Water can make no guarantee or give any warranty regarding the quality of any sewage that may be taken by a sewer miner. Prospective sewer miners need to consider this risk in assessing the viability of any proposed sewer mining operations.
To help prospective sewer miners assess risk relating to sewage quality, Sydney Water will provide sewer miners with the standards that parties need to meet when disposing of waste into the system, as well as available data on sewage quality in the parts of the sewerage system that are relevant to a sewer mining proposal.
The amount of sewage flowing through a sewerage system is a critical aspect of effective sewerage system operation and varies over time. In order to maintain adequate flows, Sydney Water determines the quantity of sewage available for extraction by sewer mining with regard to:
a) the minimum operational flow requirements of Sydney Water's sewerage system
b) the current diurnal flow pattern of the sewerage system
c) existing commitments to current and proposed water recycling schemes
d) existing commitments involving the extraction of sewage, either upstream or downstream of the proposed connection.
However, as Sydney Water cannot fully control the volume of sewage in the system, Sydney Water will make no guarantee or give any warranty regarding the quantity of sewage available to a sewer miner.
Sydney Water adopts a first come, first served approach in allocating access to sewage flows. When advising future applicants of the availability of sewage in a particular sewerage system, Sydney Water will acknowledge and honour its commitments to existing sewer mining operations.
If a sewer miner does not proceed with extraction within one year of a sewer mining agreement being entered into, or commences and thereafter ceases extraction of sewage for a continuous period of one year, the sewer mining agreement will terminate. Sydney Water will write to the sewer miner before any termination occurs.
This provides a reasonable period of time for the operation to commence, allowing for delays in construction and cyclical changes in demand. It also ensures that new sewer mining projects are not held back by the failure of others that do not proceed within a reasonable period of time.
Sydney Water will publish maps of sewerage systems showing areas excluded from new sewer mining applications on its website. Areas may be excluded on the basis of commitments to water recycling schemes and/or sewer mining agreements.
Under the Protection of the Environment Operations Act 1997 (POEO Act), the Department of Environment and Climate Change (DECC) NSW has granted Sydney Water licences for each of its sewerage systems. Those licences entitle Sydney Water to transport and treat sewage and to discharge treated effluent to the environment under prescribed conditions and with clear penalties for licence breaches.
Once sewage is extracted from a Sydney Water sewerage system by another party, it is no longer covered by a Sydney Water licence. The sewer miner becomes wholly responsible for managing and treating that sewage, disposing of any by-products of treatment, and environmental outcomes.
While Sydney Water seeks no financial gain from enabling sewer mining, it also aims to avoid any loss. Sydney Water will therefore recover from the sewer miner all costs incurred by Sydney Water in enabling the sewer mining connection and operation. Sydney Water will evaluate any financial saving realised by it from the sewer mining operation and recognise those savings in calculating any costs to be recovered from the sewer miner.
Most sewer mining schemes will involve the extraction of wastewater directly from a Sydney Water sewer. The sewer miner will need to measure the quality and quantity of wastewater extracted from the sewer and the quality and quantity of any returns to the sewer. Sydney Water will only charge for the additional load of substances discharged back to the sewer. This may include treatment additives such as iron, aluminium and sulphate. The discharge to sewer from a sewer mining operation must meet Sydney Water's acceptance standards. This condition applies even when there has been no overall increase in the load of a substance to sewer.
The published trade waste acceptance standard for return of suspended solids will be determined by the capacity of the receiving sewer directly downstream of the connection point. This means that the acceptance standard concentration of 600 mg/L for suspended solids must be achieved in the receiving sewer, taking into account other discharges from the sewer mining operation, measured by analysis of a composite sample over a typical 24-hour period. Gross solids or grit will not be accepted back to the sewer, however macerated screenings may be returned provided the acceptance standard concentration of 600 mg/L in the receiving sewer is not exceeded. The extraction point should be designed to minimise the collection of grit from the sewer.
Term | Definition |
|---|---|
Recycled water | (sometimes called 'reclaimed water') is wastewater, stormwater or greywater treated to a standard appropriate for particular uses and level of human exposure. For large scale recycling schemes, treated wastewater may be sourced from sewage treatment plants. For sewer mining, wastewater for recycling is sourced directly from the sewerage system. |
Sewage | (also called 'wastewater') is the waste material passing through a sewerage system. |
Sewerage | is the system of pipes and pumps that transport sewage. |
Sewer mining | is the process of tapping into a sewer (either before of after the sewage treatment plant) and extracting sewage which is then treated and used as recycled water. |