Current Tender

Tender 0510024980

Package 4C Reservoir Roof Renewal & Relining

  • Date advertised:
    08 July 2014
  • Closing date:
    14 August 2014
  • Package 4C Reservoir Roof Renewal & Relining to the WS0237 Hammondville Surface and WS0238 Hammondville Elevated Reservoirs

    Tender Closing Thursday 07/08/2014 at 9:30am

    Contact: Peter Gray

    Tel: 02 8849 5147

    Cost of document: $100.00 non-refundable

    email: peter.gray@sydneywater.com.au

    The tender documents are available for purchase and downloading from Sydney Water''s nominated website https://tenders.nsw.gov.au/sydneywater

    Background Summary

    This is the third contract package of reservoir renewal / repairs and relining from Reservoir Package 4. This package of work is for the full roof replacement of two reservoirs and the full relining of one reservoir. The reservoirs involved in this package are WS0237 Hammondville Surface Reservoir & WS0238 Hammondville Elevated Reservoirs known as Package 4C.

    The scope of work broadly comprises of one or more the following:

    Roofing Works – Full removal and disposal of the existing roof structure, strengthening of the existing stiffener ring. Installation of a new roof structure & sheeting, access hatches, equipment hatches, dosing ports, roof vents, etc. in accordance with construction drawings.

    Relining – Involves removal of existing bitumen internal lining, surface preparation and installation of new epoxy lining.

    • WS0237 Hammondville Surface Reservoir – Roof renewal and relining

    • WS0238 Hammondville Elevated Reservoir – Roof renewal only Mandatory Requirements

    Listed below are a list of mandatory requirements & weighting criteria which will be used by Sydney Water to determine the validity of all tender submissions provided for these projects.

    The Mandatory Criteria Mandatory Criteria

    M1 Assessed financial capability to perform the Contract

    M2 Occupational Health and Safety (minimum requirements)

    M2.1 Management System accreditation

    M2.2 Implementation of the CRC

    M3 Quality Management System Certification to AS/NZS ISO 9001

    Weighting Evaluation Criteria

    Weighted criteria Weighting (%)

    W1 Occupational Health and Safety 30%

    W1.1 Hazard Control Plan 15%

    W1.2 Management of Risks 15%

    W2 Proposed methodology and understanding 70%

    W2.1 Program / timing 25%

    W2.2 Understanding of scope and Methodology 25%

    W2.3 Resourcing and experience 20%

    TOTAL 100%