Report a fault
or leak: 13 20 90

Corruption hotline

Printer friendly versionShrink textEnlarge text

Georges River wastewater treatment plants

Effluent from two of the Georges River plants, Glenfield and Liverpool, is transported to Malabar for discharge into the ocean. However, during periods of wet weather, when the capacity of the system is exceeded, treated wastewater from these plants may be discharged into the Georges River. The third Georges River plant (Fairfield) operates only in wet weather.

Treatment
plant
Treatment level Discharge
(ML/day)1
Equivalent population2 Discharge location
Glenfield Partial tertiary 0 137,000 Treated wastewater transported to Malabar; occasionally discharged to Georges River in wet weather.
Liverpool Secondary 0 63,000 Treated wastewater transported to Malabar; occasionally discharged to Georges River in wet weather.
Fairfield Primary 0   Treated wastewater discharged to Orphan School Creek (to Georges River) during wet weather.

1 Average daily dry weather discharge.

2 Equivalent population (EP): an estimate of the number of people served by a treatment plant.