Service difficulties
and emergency
service: 13 20 90

Printer friendly versionShrink textEnlarge text

Project documentation

The following documents are available online and/or for members of the public to view at the Sydney Water library in Bathurst Street, Sydney. If you are interested in viewing the documents, please call the desalination project team on free call 1800 685 833.

Project approvals

As required by the NSW Minister for Planning as part of the planning approvals for the Sydney Desalination Project, below are the relevant Environmental assessments, determinations, current approvals, licences and permits.


Desalination Plant (including the seawater intake and outlet)
2005 PDF Major project application (PDF - 2369KB)
2005 PDF Record of linear infrastructure designation under clause 8F(4) of the Environmental Planning and Assessment Regulation 2000 (PDF - 30KB)
2005 PDF Critical infrastructure declaration (PDF - 28KB)
2005 PDF Concept plan authorisation (PDF - 25KB)
2005 PDF/Library Environmental Assessment (PDF - 37474KB)
2006 PDF/Library Preferred Project Report (PDF - 4620KB)
2006 PDF Independent panel report (PDF - 2591KB)
2006 PDF Director General's report (PDF - 626KB)
2006 PDF/Library Concept approval (PDF - 328KB)
2006 PDF/Library Project approval desalination plant (PDF - 458KB)
2006 PDF/Library Project approval seawater intake discharge (PDF - 416KB)
2007 PDF NSW Maritime approval for the temporary load-jetty at Port Botany Yard (PDF - 1581KB)

Pipeline (including drinking water pumping station)
2007 PDF/Library Environmental Assessment (PDF - 12.81MB)
2007 PDF/Library Preferred Project Report (PDF - 3.18MB)
2007 PDF/Library Project approval (PDF - 604KB)
2008 PDF Modification of approval (PDF - 143KB)
2007 PDF Director General's Report (PDF - 1364KB)
2008 PDF/Library NSW Maritime Construction Consent (Silver Beach construction area) (PDF - 3243KB)
2008 PDF Environment Protection Licence (PDF - 224KB)

Compliance tracking program

Under the Conditions of Approval for the desalination project, Sydney Water is required to develop a compliance tracking program for reporting to the Director General of the NSW Department of Planning on an annual basis.


2007 Library Compliance tracking program

Environmental management plans

Environmental management plans have been prepared as required by the Minister's Conditions of Approval prior to construction starting. The following plans are in the Sydney Water library.


Desalination plant (including the seawater intake and outlet)
2007 Library Acid Sulphate Soil and Contamination Management Plan
2007 Library Construction Soil and Water Management Plan
2007 Library Construction Noise Management Plan
2007 Library Biodiversity Protection Plan
2007 Library Traffic Management Protocol and Traffic Management Plan
2007 Library Spoil Management and Disposal Strategy & Spoil Management Plan
2007 Library Conservation Area Management Plan
2006 Library Marine and Estuarine Monitoring Program

Pipeline (including drinking water pumping station)
2008 Library Spoil Management Plan
2008 Library Erosion, Sedimentation and Groundwater Management Protocol
2008 Library Construction Traffic Management Protocol
2008 Library Construction, Noise and Vibration Management Plan
2008 Library Acid Sulphate Soils and Contamination Management Plan
2008 Library Ecosystem Monitoring Program, Botany Bay Sector
2008 Library Beach and Foreshore Monitoring, Program Botany Bay Sector
2008 Library Construction Water Management Plan, Botany Bay Sector
2008 Library Biodiversity Protection Plan, for the drinking water pumping station

Desalination plant contract

The Blue Water Joint Venture, consisting of John Holland Group Pty Ltd and Veolia Water, will design and build the plant and Veolia Water will operate and maintain the plant. Sydney Water will own the plant.


These documents do not disclose commercial-in-confidence information, in line with Section 15A of the Freedom of Information Act. Sydney Water and other state-owned corporations are exempt from these public disclosure requirements. However, the documents are being made available as part of Sydney Water's commitment to transparency.


2007 PDF Contracts Summary (PDF - 4857KB)
2007 PDF Volume 1 - Design and construct contract (PDF - 3863KB)
2007 PDF Volume 2 - Design and construct contract: Schedule 14 - Company's requirements (PDF - 3773KB)
2007 PDF Volume 3 – Refer to contract summary
2007 PDF Volume 4 - Operate & maintain contract (PDF - 8254KB)
2007 PDF Volume 5 - Operate & maintain contract: Exhibit A - Company's requirements (PDF - 4509KB)
2007 PDF Volume 6 - Other project documents (PDF - 4104KB)

Pipeline - Project alliance agreement

The pipeline will be built by the Water Delivery Alliance, which includes Sydney Water, Bovis Lend Lease, McConnell Dowell, Kellogg Brown & Root, WorleyParsons and Environmental Resources Management. Sydney Water will own the pipeline.


These documents do not disclose commercial-in-confidence information, in line with Section 15A of the Freedom of Information Act. Sydney Water and other state-owned corporations are exempt from these public disclosure requirements. However, the documents are being made available as part of Sydney Water's commitment to transparency.


2008 PDF Water delivery alliance - Project Alliance Agreement for Amending deed 1 (Redacted) (PDF - 2.71MB)
2008 PDF An Introduction to the Desalination pipeline Project Alliance Agreement (PDF - 5.01MB)